More than a meteorite: New clues about the demise of dinosaurs
|
/eps |
|
Study yields new insights into the link between global warming and rising sea levels
|
/eps |
|
Construction Start: MNI & Duff – Envelope repairs
|
/facilities |
|
Construction Start: Life Science Complex - CFI BRIF Vidal
|
/facilities |
|
Construction start: McLennan Library – Convert 25kv distribution switches
|
/facilities |
|
Construction start: Redpath Library, McTavish Wing – Rehabilitation of Building Envelope - Lot 1, Repair and waterproofing of foundations, and Lot 2, Slate roof repair
|
/facilities |
|
Construction start: Royal Victoria College (RVC) Residence - Masonry work
|
/facilities |
|
Construction Start: Otto Maass Chemistry - CFI IF 2020, Cooke
|
/facilities |
|
Construction Start: Strathcona Music Building - Rehabilitation of building envelope
|
/facilities |
|
Construction Start: McCall MacBain Arts - Masonry work
|
/facilities |
|
Feb. 7 - Update on closure of Moyse Hall
|
/facilities |
|
Safety around construction sites
|
/facilities |
|
Feb. 19 – Reopening of auditorium 2/36 at SAD on schedule
|
/facilities |
|
Construction Start: Strathcona Music - Renovation of Pollack Hall
|
/facilities |
|
Steam shutdown planned on downtown campus on Oct. 3
|
/facilities |
|
Construction start: Redpath Hall – Rehabilitation of Building Envelope - Lot 1, Repair and waterproofing of foundations, and Lot 2, Slate roof repair.
|
/facilities |
|
Construction Start: Modification of classroom locks in McConnell Engineering, Trottier and Wong buildings
|
/facilities |
|
Steam and noise at the downtown powerhouse due to boiler tests
|
/facilities |
|
Feb. 16 – Update on testing and closure of auditorium 2/36 SAD
|
/facilities |
|
Construction Start: Parasitology Building - JELF Cestari
|
/facilities |
|
Feb. 14 - Closure of auditorium 2/36 SAD extended at least until Feb. 21
|
/facilities |
|
Steam and noise expected near downtown powerhouse due to boiler tests
|
/facilities |
|
Construction start: Montreal Neurological Institute - Balustrade
|
/facilities |
|
Construction start: Macdonald-Stewart - Upgrade Fire Suppression System LOT 1A
|
/facilities |
|
Fall shoulder season
|
/facilities |
|
Construction Start: Burnside Hall - Modernization of the elevators
|
/facilities |
|
Construction Start: McIntyre, Stewart Biology, Life Sciences, and Ludmer - repairs in research spaces
|
/facilities |
|
Construction start: MNI (Neuro) - CFI JELF room 254 renovation
|
/facilities |
|
Feb. 8 – Auditorium 2/36 SAD remains closed
|
/facilities |
|
Construction Start: MNI, Residences, Currie Gym, Milton Gate and Burnside Parking - Infrastructure for new parking equipment
|
/facilities |
|
Construction Start: Wong Building - Space simulator
|
/facilities |
|
Construction Start: Centennial Centre - Temporary classrooms
|
/facilities |
|
Construction Start: McIntyre Medical - Renovation room 334
|
/facilities |
|
Planned electrical shutdowns to affect downtown campus – Sunday, March 3rd
|
/facilities |
|
Construction start: Arena McConnell Upgrade - Lot 2
|
/facilities |
|
Closure of buildings for major electrical shutdown at Macdonald Campus - May 3 to 5
|
/facilities |
|
Construction Start: Life Sciences Complex - address water leaks in curtain wall
|
/facilities |
|
Jan. 19 - Temporary closure of Moyse Hall
|
/facilities |
|
Construction start: Burnside Hall – 10th floor offices
|
/facilities |
|
Construction start: Raymond (Macdonald Campus)– JELF Dastmalchi (Lot 1)
|
/facilities |
|