Ventilation in your building and CO2 measurements

CO2 measurement schedule

 
Building Room Date

If you have any questions about the measurement schedule, please contact Incident Command at incident.command [at] mcgill.ca.

CO2 measurement results

Building

Room Date of CO2 Measurement Pass In Review* Mitigating Measures
MUSIC C-201 Oct 4 X    
MUSIC C-204 Oct 4 X    
ENGMC 12 Oct 4 X    
ARTS W-20 Oct 4 X    
ARTS 230 Oct 5 X    
ATHLETICS COMPLEX 305 Oct 5 X    
ATHLETICS COMPLEX 408 Oct 5 X    
ADAMS 232 Oct 6 X    
MDHAR 420 Oct 6 X    
STBIO N5/1 Oct 6 X    
CURRIE 101 EXAM Oct 6 X    
MDHAR 207 Oct 6 X    
MCMED 1345 Oct 7 X    
MCMED 1027 Oct 7 X    
DUFF 321 Oct 7 X    
MCMED 206/7 Oct 7 X    
DUFF 507/509 Oct 8 X    
ENGMC 103 Oct 8 X    
CURRIE 304 EXAM Oct 8 X    
MCMED 908 Oct 8 X    
CURRIE GYM 3/ 4 Oct 16 X    
MCMED 521 Oct 18 X    
LUDMER 138 Oct 18 X    
MOR 328 Oct 18 X    
CURRIE B-208 Oct 18 X    
CENTEN CC-212 Oct 19 X    
RAYMND R3-048 Oct 19 X    
RAYMND R4-045 Oct 20 X    
MACSTW MS2-029/028 Oct 20 X    
RAYMND R2-047 Oct 20 X    
RAYMND R2-046 Oct 20 X    
ADAMS 126 Oct 21 X   Ventilation has been optimized. Room re-measured after mitigating measures taken. Results satisfactory.
CURRIE A207 Oct 21 X    
CURRIE 233 Oct 21 X    
CURRIE 124-1 Oct 21 X    
CURRIE 124-2 Oct 21 X    
CURRIE 124-3 Oct 21 X    
MCMED 1019 Oct 21 X    
RAYMND R1-042 Oct 22 X    
RAYMND R3-045 Oct 22 X    
RAYMND R4-046/48 Oct 22 X    
MACSTW MS2-026 Oct 25 X    
CENTEN Corridor Oct 25 X   Keep doors and windows open as much as possible. Room re-measured after mitigating measures taken; results satisfactory.
CURRIE G17A&B Oct 26 X    
MDHAR 212 Oct 26 X   Keep doors and windows open as much as possible. Room re-measured after mitigating measures taken; results satisfactory.
MDHAR 214 Oct 26 X    
MDHAR 215 Oct 26 X   Ensure maximum capacity level of 32 is respected. Room re-measured after mitigating measures taken; results satisfactory.
MDHAR 1-Hall 3 Oct 26 X    
MCMED 1034 Oct 27 X    
CDH 100 Oct 27 X    
MDHAR 314 Oct 28 X    
MDHAR 500 Oct 28 X    
MDHAR 514 Oct 28 X    
MDHAR 505 Oct 28 X    
MDHAR 508/510 Oct 28 X    
ARTS 385 Oct 29 X    
CURRIE 152 Nov 1 X    
BIRKS Corridor Nov 1 X    
BIRKS 203 Nov 2 X    
STBIO S2/2 Nov 4 X    
PURVIS 24 Nov 4 X    
MDHAR 409 Nov 4 X    
MDHAR 312 Nov 5   X
Keep doors and windows open as much as possible. Room monitoring ongoing.
MCMED 210 Nov 8 X    
PL 3647 102 Nov 8 X    
PL 3647 101 Nov 8 X    
ADAMS 315 Nov 9 X    
REDPTH 106A/106B Nov 10 X    
MUSIC E-109 Nov 10   X Monitor capacity. Keep doors and windows open as much as possible.
SAD M-48 Nov 12 X   Monitor capacity. Keep doors and windows open as much as possible.
MOR 313 Nov 15 X   Keep doors and windows open as much as possible. Room re-measured after mitigating measures taken; results satisfactory.
3661 PEEL 106 Nov 15 X   Monitor capacity. Keep doors and windows open as much as possible.
DAVIS 20 Nov 15 X   Monitor capacity. Keep doors and windows open as much as possible. Room re-measured after mitigating measures taken; results satisfactory.
MDHAR G-10 (112) Nov 16   X Monitor capacity. Keep doors open as much as possible. Room monitoring ongoing.
MDHAR 115 Nov 16   X Keep doors and windows open as much as possible. Room monitoring ongoing.
ADAMS 126 Nov 17 X   Ventilation has been optimized. Room re-measured after mitigating measures taken; Results satisfactory.
BIRKS 17 Nov 17 X   Keep doors open as much as possible. Room re-measured after mitigating measures taken; Results satisfactory.
DAVIS 3 Nov 17 X    
MCMED 521 Nov 17 X    
DAVIS B-2 Nov 18 X   Keep doors and windows open as much as possible. Room re-measured after mitigating measures taken; results satisfactory.
FARM 15 Nov 18 X   Keep doors and windows open as much as possible. Room re-measured after mitigating measures taken; results satisfactory.
RAYMND R2-045 Nov 18 X   Keep doors and windows open as much as possible. Room re-measured after mitigating measures taken; results satisfactory.
BARTON B1-015 Nov 19 X   Keep doors and windows open as much as possible. Room re-measured after mitigating measures taken; results satisfactory.
BARTON B1-016 Nov 19 X   Keep doors and windows open as much as possible. Room re-measured after mitigating measures taken; results satisfactory.
ARTS W-5 Nov 22 X   Monitor capacity. Keep doors and windows open as much as possible. Room re-measured after mitigating measures taken; results satisfactory.
MUSIC E-215 Nov 22 X   Keep doors open at all times and windows when possible. Room re-measured after mitigating measures taken; results satisfactory.
ARTS 350 Nov 22   X Monitor capacity. Keep doors open at all times and windows as much as possible. Room monitoring is ongoing.
BIRKS 205 Nov 23 X   Keep doors open at all times and windows when possible. Room re-measured after mitigating measures taken; results satisfactory.
BIRKS 004A Nov 23   X Keep doors open at all times and windows when possible. Room monitoring ongoing.
BIRKS 105 Nov 23   X Monitor capacity. Keep doors and windows open as much as possible.
BIRKS 111 Nov 23 X   Keep doors open at all times and windows when possible. Room re-measured after mitigating measures taken, results satisfactory.
MDHAR 101 Nov 24   X Keep doors open at all times and windows as much as possible. Room monitoring ongoing.
MDHAR 102 Nov 24   X Keep doors open at all times and windows as much as possible. Room monitoring ongoing.
MDHAR G-01 Nov 24   X Keep doors and windows open as much as possible. Room monitoring ongoing.
CENTEN CC-150 Nov 25   X Keep doors open at all times. Room monitoring ongoing. Construction in area impacting air quality.
MUSIC C-302 Nov 25   X Keep doors and windows open as much as possible.
MUSIC C-312 Nov 25   X Monitor capacity. Keep doors and windows open as much as possible.
MUSIC C-301 Nov 25   X Monitor capacity. Keep doors and windows open as much as possible. Room monitoring ongoing.
MUSIC C-304 Nov 25   X Monitor capacity. Keep doors open at all times and windows when possible. Room monitoring ongoing.
MUSIC C-309 Nov 25   X Keep doors open at all times and windows when possible. Room monitoring ongoing.
MUSIC C-411 Nov 26   X Keep doors and windows open as much as possible. Room monitoring ongoing.
MUSIC E-109 Nov 26   X Monitor capacity. Keep doors and windows open as much as possible. Room monitoring is ongoing.
PE 1085 2 Nov 29 X   Keep doors and windows open as much as possible. Room re-measured after mitigating measures taken, results satisfactory.
PE 1085 117 Nov 29   X Monitor capacity. Keep doors and windows open as much as possible. Room monitoring is ongoing. Room monitoring ongoing.
HOSMER 301 Nov 30 X   Keep doors and windows open as much as possible. Room re-measured after mitigating measures taken; results satisfactory.
HOSMER 202 Nov 30   X Monitor capacity. Keep doors and windows open as much as possible. Room monitoring is ongoing.
CENTEN Ballroom (CC-222) Dec 2   X Keep doors and windows open as much as possible. Room monitoring is ongoing. Construction in area impacting air quality.
CENTEN CC-163 Dec 2 X   Monitor capacity. Ventilation has been optimized. Room remeasured, results satisfactory.
CENTEN CC-162 Dec 2 X   Monitor capacity. Keep doors and windows open as much as possible. Room remeasured, results satisfactory.
RAYMND R2-045 Dec 2 X    
CURRIE GYM 1,2,3,4 Dec 7 X   Measured during final examinations.
CURRIE Field House Dec 7 X   Measured during final examinations.

*Rooms with C02 results above 1,000 and below 2,000 ppm are considered "In Review" and will undergo immediate correction to make them more comfortable. Additional mitigating measures are also taken. Where manual intervention is required, recommendations are made to improve air quality in these rooms, and they are monitored on an ongoing basis.

If you have any questions about the measurement results, please contact Incident Command at incident.command [at] mcgill.ca.

Ventilation in your building

Downtown Campus

Bldg # Building Mechanically Ventilated Naturally Ventilated Comments
101 Ludmer X    
102 Bronfman X    
103 McCall MacBain Arts X    
104 McTavish 3438 X    
105 McConnell Winter Stadium X   Lobby and VIP suite only
106 Percival Molson Stadium X   Some team rooms and some concessions only
108 McLennan Library X    
109 University 3534   X  
110 Burnside Hall X    
111 Stewart Biological Sciences Building X    
112 James Administration Building X    
114 McTavish 3434 X    
116 Molson Hall X    
117 Peel 3715 X    
118 Macdonald-Harrington Building   X The annex area, G-10 (112), 115, 212, 214, 312, 314, 500, 505, 508, and 514 are mechanically ventilated.
119 Otto Maass Chemistry Building X    
120 Strathcona Music Building X  

Concert hall, cafeteria, lounge, toilet and rooms C201, C204, C209, C310.

121 Carrefour Sherbrooke Residence X    
122 Chancellor Day Hall X   New Wing Only
123 Dawson Hall X    
124 Birks   X  
125 Douglas Hall X    
127 Duggan House   X  
128 Davis House   X  
129 Faculty Club   X  
130 Macdonald Engineering Building X    
131 McConnell Engineering Building X    
132 Hosmer House Annex   X  
133 Gardner Hall X    
134 Bishop Mountain Hall X    
135 McTavish 3430 X    
136 Peel 3475   X  
137 Peel 3661   X  
138 Peel 3495   X  
139 Currie Gym X    
140 Peel 3465   X  
141 Pine 517   X  
142 Pine 510   X  
143 Peel 3437   X  
144 Pine 522      
145 Peel 3491   X  
146 Solin Hall X    
147 Meredith Annex   X  
148 Lady Meredith House   X  
149 Hosmer House   X  
150 Leacock X    
151 Peel 3479   X  
153 Pine 505   X  
154 Strathcona Anatomy & Dentistry Building X    
155 McIntyre Medical Sciences Building X    
156 Mountain 3605 X    
157 McIntyre Garage X    
158 Pulp & Paper Research Centre X    
159 Montreal Neurological Institute and Hospital X    
160 University 3661   X  
161 Rabinovitch House   X  
162 Pine 546   X  
163 Morrice Hall X    
164 Pine 527   X  
165 Peterson Hall X    
166 Peel 3674   X  
167 Hugessen House   X  
168 Education Building X    
169 Duff Medical Sciences Building X    
170 Macdonald-Stewart Library X    
171 Pine 509   X  
172 University Centre X    
173 Charles Meredith House   X  
174 Purvis Hall   X  
175 Peel 3690   X  
176 University 3550   X  
177 Frank Dawson Adams Building X    
178 Redpath Library X    
179 Redpath Museum   X  
180 Royal Victoria College (RVC) Residence X    
181 Redpath Hall X    
184 Pine 515   X  
185 Armstrong Building X    
187 Peel 3487   X  
188 Thomson House   X  
189 Rutherford Physics Building X    
190 Penfield 1085   X  
191 Peel 3459   X  
192 Peel 3463   X  
193 University 3653   X  
194 Peel 3647   X  
195 Pine 499   X  
196 Pine 1140   X  
197 Ferrier Building X    
198 Wilson Hall   X  
199 Thomson House Annex   X  
200 University 3575   X  
205 University 3559   X  
208 Peel 3661A   X  
209 Peel 3704   X  
211 Peel 3710   X  
213 Peel 3483   X  
214 McTavish 3610   X  
216 University 3641   X  
217 University 3643   X  
218 University 3647   X  
219 Pine 506   X  
221 McConnell Hall X    
222 Hutchison 3464   X  
223 Duggan House Annex   X  
224 Davis House Annex   X  
228 Peel 3712/14   X  
229 Wong Building X    
230 Peel 3505   X  
231 Gelber Law Library X    
233 Sherbrooke 688 X    
234 Pine 523   X  
236 Brown Student Services Building X    
237 University 3601   X  
239 Penfield 740 (Genome Building) X    
240 Trottier Building X    
241 Life Sciences Complex X    
242 Martlet House X    
243 Pine 501   X  
244 New Residence Hall X    
245 Elizabeth Wirth Music Building X    
246 Sherbrooke 680 X    
247 Steinberg Simulation Center X    
249 Durocher 3465 X    
250 Peel 3471   X  
251 University Hall Residence   X  
252 La Citadelle Residence X    

Macdonald Campus

Bldg # Building Mechanically ventilated Naturally ventilated Comments
401 Technical Services Building   X Exhaust only
402 Pesticide Storage Shed   X Exhaust only
405 Barton Building X    
408 Facilities Management Building   X Exhaust only in the mechanics garage
409 Cattle Barn (Old)   X  
410 Cattle Complex   X Exhaust only in the animals section
411 Centennial Centre X   No systems running during construction project
412 Chalet Pruche   X  
414 Chemin Ste-Marie 21219-21221   X Macdonald Campus Housing
415 Chemin Ste-Marie 21225   X Macdonald Campus Housing
417 C.I.N.E. Building X   Except East Wing
418 Cluster Cottage   X Macdonald Campus Housing
420 Conservation Centre   X  
421 East Cottage 1-2   X Macdonald Campus Housing
422 East Cottage 3-4   X Macdonald Campus Housing
423 East Cottage 5-6   X Macdonald Campus Housing
424 East Cottage 7-8   X Macdonald Campus Housing
425 East Cottage 9-10   X Macdonald Campus Housing
426 East Cottage 11-12   X  
427 Farm Centre   X  
429 Glenaladale House & Terrace   X Macdonald Campus Housing
430 Glenaladale Terrace 1-4   X Macdonald Campus Housing
431 Glenaladale Terrace 5-8   X Macdonald Campus Housing
432 Glenfinnan Rink   X  
433 Harrison House   X  
437 Horticulture Services Building   X  
440 Laird Hall   X Exhaust for local kitchens and bathrooms only
441 Lakeshore Road 21048   X Macdonald Campus Housing
442 Lakeshore Road 20846   X Macdonald Campus Housing
443 Large Animal Research Unit X   Room 104 only
444 Lods Research Centre   X  
446 Macdonald-Stewart Building X    
447 Macdonald Campus Daycare   X  
448 Maple 3   X Macdonald Campus Housing
449 Maple 5   X Macdonald Campus Housing
450 Stewart House   X  
451 Maple 9   X Macdonald Campus Housing
452 Maple 11   X Macdonald Campus Housing
453 Maple 13   X Macdonald Campus Housing
454 Maple 15   X Macdonald Campus Housing
455 Conklin House   X Macdonald Campus Housing
456 Snell House   X Macdonald Campus Housing
457 Maple 23   X Macdonald Campus Housing
459 Maple 27   X Macdonald Campus Housing
460 Maple 29   X Macdonald Campus Housing
461 Marshall Radar Observatory   X  
465 Nutrition Barn   X  
467 Parasitology Building X    
471 Plant Research Facility   X Basement only
473 Poultry Brooder House   X Macdonald Campus Housing
474 Poultry Cottages   X Macdonald Campus Housing
482 South Powerhouse   X  
483 Avian Research Wintering Barn   X  
484 Avian Research Main Barn   X  
485 Raymond Building X    
486 Raymond Greenhouse 1   X  
489 Reford Terrace 1-4   X Macdonald Campus Housing
490 Reford Terrace 5   X Macdonald Campus Housing
491 Rivermead Terrace 1-2   X Macdonald Campus Housing
492 Rivermead Terrace 3-4   X Macdonald Campus Housing
493 Rivermead Terrace 5-6   X Macdonald Campus Housing
494 Rivermead Terrace 7-8   X Macdonald Campus Housing
495 Robertson Eco-Residence 1   X  
496 Robertson Eco-Residence 2   X  
497 Rowles House   X  
498 Pines Cottage   X Macdonald Campus Housing
500 Stewart Athletic Complex X   Changing rooms, fitness centre, and 3rd floor Gymnasium only
501 Stewart Park 3   X Macdonald Campus Housing
502 Stewart Park 4   X Macdonald Campus Housing
503 Stewart Park 5,6   X Macdonald Campus Housing
504 Stewart Park 7   X Macdonald Campus Housing
505 Stewart Park 8   X Macdonald Campus Housing
506 Stewart Park 9   X Macdonald Campus Housing
507 Sugar House   X  
509 Swine Complex X   Exhaust only
510 Tadja Hall   X  
512 White Cottage 2   X Macdonald Campus Housing
513 White Cottage 3   X Macdonald Campus Housing
514 White Cottage 1   X Macdonald Campus Housing
520 Shaver Poultry Unit X   Poultry ventilation system only
521 North Powerhouse X    

McGill Rented Spaces

Bldg # Building Mechanically ventilated Naturally Ventilated Comments
  Cote des Neiges, 5858 x    
  Maisonneuve, 5100 x    
  McGill College, 2001 x    
  Place du Parc (La Cite) - Sim Centre x    
  Peel, 1555 x    
  Sherbrooke, 550 x    
  Sherbrooke, 1010 x    
  Sherbrooke West, 1980 x    

Gault Nature Reserve

Bldg # Building Mechanically ventilated Naturally Ventilated Comments
226 Penfield Property   x  
700 Gite Cottage   X  
701 Chalet 1   X  
702 Gault House   X  
703 Research Centre   X  
704 Alice Johannsen Building   X  
708 Workshop / Garage   X  
714 Stearn Lithological Library   X  
718 Chalet 2   X  
Back to top