Capital Alterations
Requests for Capital Alterations are made by contacting the Facilities Call Centre (FCC). Requests submitted through the FCC may include: Corrective maintenance, modification/installation of new products and services, and capital projects.
To contact the FCC:
Downtown campus
Phone: 514.398.4555
Fax: 514.398.3691
fcc [dot] downtown [at] mcgill [dot] ca (Email)
Macdonald campus
Phone: 514.398.7828
Fax: 514.398.7969
fcc [dot] macdonald [at] mcgill [dot] ca (Email)
Note: All emergencies must be reported by telephone
Building Maintenance
Under construction
Building Plans
The Facilities and Space Management System (FAMIS) is McGill’s space management system (available to McGill staff). FAMIS enables Building Directors to access and update current building and floor plans via the Visual Map module.
To access the software, or for more information, log-in here
Space Data
The Facilities and Space Management System (FAMIS) is McGill’s space management system (available to McGill staff). FAMIS enables Building Directors to access information regarding building, floor or office space use within their building.
To access the software, or for more information, log-in here
Building Regulations
Building Director Regulations establish suitable arrangements for the safety and security of life and property, the efficient accommodation of academic requirements, and the optimum use of available facilities within the University.
Fire Protection Policy
The aims of this policy are to prevent fires and, in the event of a fire, to prevent injuries, loss of life, or damage to property. It is based on the applicable fire prevention codes and on University standards, as set by the Central Safety Committee.
To access the policy, please access the following link.
Accessibility
Signage
All requests for new or replacement interior and exterior signage should be sent via the Facilities Call Centre process.
Please ensure that all signage standards are followed, as required.
Please ensure all exterior signage elements are coordinated through the individual Building Director.